1) After the muffle is completed, all openings are gasketed and covered with blind flanges.
2) Air is injected until 3 PSI is attained.
3) All body welds are brushed with soap solutions.
4) No leaks or indications are observed.
5) After soap bubble testing, the pressure is maintained for 14 hours, with no loss.
Metal furnace muffle assembly

Do you have questions or comments? Please contact us!